IT Reseller Magazine
Article Search: Go To: Keyword 
 
   

FREE Subscription to IT Reseller Magazine






Power/UPS
Uninterruptible power supply and power protection


Equinix Datacentres enable Camelot to deliver cutting-edge UK National Lottery for the next 10 years
June 18, 2008  

Equinix Inc., a leading global provider of network-neutral datacentres and Internet exchange services, and Camelot, the licensed operator of the UK National Lottery, have announced that Camelot will deploy operations for its new communications network in one of Equinix’s European datacentres. 

After winning its third licence to operate The National Lottery for 10 years from February 2009, Camelot is implementing its carefully-prepared transition plans to ensure that the lottery is in the best possible shape for the start of the new licence period. The plans include the introduction of a new communications network to replace the existing ISDN network in National Lottery retail outlets.

Camelot will operate the new infrastructure within a dedicated datacentre suite at the Equinix facility, which will form the central hub of Camelot’s information systems, processing all of the data coming in from its new satellite network. The move will provide Camelot with direct access to a high-performance datacentre platform designed to host high-density computing infrastructures offering a rich source of robust network connectivity.

These important elements will provide Camelot with a cutting-edge infrastructure that offers a high-performance and reliable platform for new lottery products and player services for the next 10 years. 

Jonathan Root, Chief Systems Architect at Camelot, said: “Equinix is playing a critical role in enabling us to meet our plans for the third licence. Our service delivery infrastructure demands a more sophisticated datacentre and we were attracted by the premium solution provided by Equinix. We can build our systems in an extremely secure environment, which benefits from acknowledged operational excellence and the added resilience of direct access to multiple network providers.”

Michael Winterson, VP Sales and Marketing at Equinix in Europe, commented: “Camelot has made considerable achievements over the last 13 years, running the most cost-efficient lottery in Europe and returning a higher proportion of lottery revenue to society than any other major lottery operator in the world. Its commitment to a high-performance communications infrastructure has played a critical role in these successes. The partnership with Equinix will provide them with a perfect platform to continue this outstanding success story.”

 


About Camelot and The National Lottery

Camelot Group plc is the licensed operator of The National Lottery® and is committed to raising money for the Good Causes designated by Parliament. Camelot is not responsible for distributing or awarding these funds. To date, over £21 billion has been raised for the Good Causes by The National Lottery, and more than 294,000 individual awards have been made across the UK – the biggest programme of civic and social regeneration since the 19th Century. The National Lottery has given away over £32 billion in prizes and created more than 2,175 millionaires or multi-millionaires since launch in 1994.

Camelot runs one of the most cost-efficient lotteries in the world, with around 5% of total revenue taken in operating costs. At 40% of total sales (28% to the Good Causes and 12% in lottery duty to the Government), Camelot returns a higher proportion of lottery revenue back to society than any other lottery operator in the world. National Lottery retailers receive 5% of total revenue in commission, and 50% of sales is paid out to players in prizes.

Players of all National Lottery games must be aged 16 or over. The crossed fingers logo is the registered trademark of the National Lottery Commission.
 

About Equinix

Equinix is the leading global provider of network-neutral data center and interconnection services, offering premium colocation, traffic exchange and outsourced IT infrastructure solutions.  Global enterprises, content companies, systems integrators and network service providers look to Equinix Internet Business Exchange (IBX®) centers for world-class reliability and network diversity.  Equinix IBX centers serve as critical, core hubs for IP networks and Internet operations worldwide.  With 39 IBX centers located in 18 strategic markets across North America, Europe and Asia-Pacific, Equinix enables customers to reliably operate their mission-critical infrastructure on a global basis.


Other Power/UPS News Power/UPS White Papers
Riello UPS awarded Investors in People status
Investors in People is a nationally recognised quality standard for improving an organisation's performance through the development of its people.
Riello UPS expands ECO energy rating system with new web-based calculator for data centre managers
The new calculator will compare the green credentials of Riello uninterruptible power supplies to competitor systems and the European Code of Conduct for UPS Energy Efficiency
New quality standards in power supply
Emerson Network Power ‘provides new quality standards in power supply’ with Liebert AF filter.
UPS from AEG Power Solutions - fast delivery and full support
AEG Power Solutions offers fast delivery of high reliability, cost effective UPS solutions for Electrical Contractors and Installers.
APC and CA team to fully optimise and modernise data centre
APC by Schneider Electric and CA, Inc. have announced a partnership that will provide enterprise customers with a fully integrated solution set for assessing and fully optimising their data centre energy consumption
Allied Telesis reduces wattage and goes green
Allied Telesis goes green with its new ecologically engineered range of products which have been designed to operate with the lowest possible power consumption

More >>

Designing Resilience Into Secure Power Systems
Leo Craig, Sales Manager for Riello Galatrek Ltd
Business continuity plans include an ever increasing reliance on secure power systems. Whilst the mean time between failure (MTBF) of uninterruptible power supplies continues to rise above
100,000 hours, more can be done at the design stage to increase their overall resilience and availability. Free white paper.
HEADS OR TAILS?
Jason Koffler, UK Channel Manager, MGE UPS Systems
HOW TO CHOOSE THE RIGHT UPS. Free white paper.
Top 10 tips for ensuring 24/7 power availability
Does your IT/Telecom equipment have nine lives?

More >>

advertisements


 



Related Articles


Let the news come to you!
Subscribe to our weekly newsletter and the digital edition of IT Reseller Magazine!

Email Address:   



© Copyright 2006, IBC - Interactive Business Communications

Help | Contact Us | PrivacyRSS Feeds | Site Map | Advertise
YourTechTV.com Only Technology Videos